Skip to content
Oil & Gas · Engineering consulting

Your firm's past work, found and cited.

Twenty years of deliverables, answering the question your proposal team is asking this week, cited to the project they came from.

1,900 deliverables · 20 years Precedent set 3 projects · cited due Friday
Every answer cited SOC 2 Type II ISO 27001
The problem, in your words

The firm has done it before. Nobody can find it.

For principals, engineering managers, and the project, process, and PSM engineers whose deliverable is judgment backed by records. The prior version lives in per-client folders, personal drives, and the memory of whoever ran the job.

“We already did this on another job.”

The last project's version is buried in a client folder.

What happens Engineers spend the day hunting for prior work and references instead of engineering.

New hires take months to go billable.

The gap is “where things are” and “which standard governs.”

The exposure Firm know-how is tacit and at retirement risk.

“Which requirement governs this call?”

Code, client spec, or firm standard, it depends.

The scope One question can span a dozen regs, specs, and client standards.
The app for this work

"We have done this before", with the project attached

It finds the prior projects that match the problem and stops for your read on which are genuinely comparable.

Input New scope, separator sizing, sour service

Two comparable projects, one caveat
  • Both used the same design basis
  • The client spec was revised in 2021
Project 2019-114, p.22Client spec rev 2021
Click a step to jump to it

Whether a precedent applies is engineering judgment, so the app gathers the candidates and their basis and leaves the call to you.

Every step runs on your own documents, every output cited. See how Agentic Apps work →

On the Marketplace

Start stocked with the regs your clients live under.

Cited public regulatory knowledge, loaded before a single deliverable comes in.

Title 49 CFR pipeline safety

Parts 190 to 195, cited to the controlling clause.

OSHA, Title 29 CFR

5,800+ pages incl. PSM 1910.119 and 1926 construction.

PHMSA & NTSB investigations

5,000+ pages of federal incident findings, cited.

EPA petroleum standards

Refinery & terminal rules incl. SPCC 40 CFR 112.

Your firm's own reports, calcs, and the standards you hold licenses to come in alongside, so the prior deliverable surfaces cited next to the reg.

Built for this work

The apps we build for consulting firms

Prior Work Finder

The comparable project, found before the proposal closes.

Standards Resolver

Which clause controls, cited to the edition.

PHA / PSM Q&A

Prior studies and relief docs, traced to source.

Proposal Precedent Pack

Three comparable projects, assembled and cited.

See it on your own deliverables

See cited answers running on your firm's prior work.

Thirty minutes, a slice of your own reports and calcs, and your engineers see the citations before anyone signs anything.